Runtime View Antipattern: Code-Level Activity Diagram

A runtime view shows how a system behaves while it runs. It describes how the system fulfills a task and which building blocks take part (see the article Runtime View).

The antipattern appears when someone draws a detailed activity diagram of one code execution. Typical signs are notes that name code packages or scripts, and steps such as parallel checks of a mainframe, a database and a satellite link.

Why this is a problem

  • Detailed scenarios amount to visualizing a single code execution. Developers look in the source code for details anyway, so they rarely need such diagrams.
  • The diagram does not answer the questions that matter at the architecture level. It does not show which building blocks are involved or which responsibility each one carries.
  • arc42 advises documenting details with caution, and only if stakeholders really need them.

What to do instead

  • Choose scenarios by architectural relevance. A small, representative selection beats many scenarios.
  • Write schematic scenarios. They refer to higher-level building blocks, not to code-level elements.
  • Map building blocks to activities. This assigns responsibilities to the building blocks.
  • Pick a notation that fits. arc42 lists numbered steps, activity diagrams, sequence diagrams, BPMN and state machines.
  • If you use an activity diagram, use swimlanes. They group activities by actor or building block instead of listing code internals.
  • The arc42 FAQ also suggests a numbered list that names the building block doing each step, or a sequence diagram that maps building blocks to their actions.

A team documents a “system health check” scenario. The first draft is an activity diagram with three parallel branches and notes naming a code package and a script. A reader learns what the code does, but not which building block owns the check.

The team redraws it as a numbered list. Step 1: the Monitor block asks the Gateway block for status. Step 2: the Gateway block asks each connected system. Step 3: the Monitor block reports the result. Now the reader sees who collaborates and who is responsible.

Schematic scenarios leave out detail. That is usually fine, because developers read the source code for specifics. When stakeholders really need a detailed scenario, arc42 allows one, but only with caution. Each detailed diagram also has to be kept up to date next to the code it describes.

  • Each runtime scenario was chosen for its architectural relevance, and the set is a representative selection.
  • Scenarios refer to building blocks, not to code-level elements such as package or script names.
  • Each scenario assigns activities to building blocks, so responsibilities are visible.
  • Activity diagrams use swimlanes for actors or building blocks.
  • Detailed single-execution scenarios exist only where stakeholders need them.