Interoperability Scenario
Explanation
Section titled “Explanation”Interoperability is the degree to which systems can exchange information (see the article Interoperability). In the ISO 25010 quality model it sits under compatibility, together with co-existence. A vague goal such as “our systems should work together” is hard to check. A scenario splits it into parts a team can test.
The general scenario has these parts:
- Source: a system that starts a request to interoperate with another system.
- Stimulus: the request to exchange information among systems.
- Environment: the interoperating systems are either discovered at runtime or known before runtime.
- Artifact: the systems that want to interoperate.
- Response: the request ends in one of two ways. Either the information is exchanged and the receiver understands it both syntactically and semantically. Or the request is rejected and the appropriate entities are notified. In both cases the request may be logged.
- Response measure: how well the response was carried out. A typical measure is the share of exchanges that are correctly processed or correctly rejected.
“Syntactically” means the receiver can read the format. “Semantically” means it understands the meaning.
To write a concrete scenario, replace each generic part with a real system, a real request and a real number. See Quality Attribute Scenario for the general idea.
The scenario also helps you choose tactics. A tactic is a design move that helps reach a desired response. Examples:
- Discover service: find a service by searching a known directory. This fits when the systems must be found at runtime.
- Orchestrate: use a control mechanism to coordinate the systems. This fits complex interactions.
- Tailor interface: add or remove capabilities of an interface, such as translation or buffering.
Example
Section titled “Example”An invented example. A webshop (source) sends an order request (stimulus) to a payment provider (artifact). Both systems are known before runtime (environment). The provider either accepts the order data and processes it, or rejects it and notifies the shop. It may log the request (response). The team requires that every exchange is correctly processed or correctly rejected (response measure). They can then test that goal with sample requests.
Diagram source
flowchart LR S[Source: system starts request] --> T[Stimulus: exchange information] T --> A[Artifact: systems involved] A --> R{Response} R -->|accept| X[Exchange information] R -->|reject| N[Notify entities] X --> L[Log optional] N --> LChecks
Section titled “Checks”- Each interoperability requirement names the source system that starts the request and the systems involved in the exchange.
- The scenario states whether the interoperating systems are known before runtime or discovered at runtime.
- The scenario defines what happens when a request is accepted and when it is rejected, including who is notified.
Related
Section titled “Related”- Interoperability
- Quality Attribute Scenario
- Compatibility
- ISO/IEC 25010 Product Quality Model
- Architectural Tactic
- Availability Scenario
- arc42 Quality Requirements
Sources
Section titled “Sources”- interoperability | Learning — hanfak.gitbook.io, accessed 2026-11-09
- Interoperability | Notebook — satche.github.io, accessed 2026-11-09
- Compatibility — iso25000.com, accessed 2026-11-09